Lean Manufacturing and Lean Office
Lean Manufacturing: Lean Processes, adapted implementation strategies, optimized flows and stock
Lean Office: Simplification of processes, reduction of administrative costs, business hours management
Aircraft Parts Servicing Company Lean Project to re-structure workshops
- Definition of standards, re-structuring rules, steering and visual management
- Creation of Lean sites to re-organise each repair line, involving floor supervisors and operators
- Identification of upgrade requirements prior to set up (noise, ergonomics, 5S, standardization)
- Designing investment and activity continuity plans with the management team
Project underway, targeted gains:
Reduction of the Lead Time
Increased productivity
Reduction of TMS
Regional Retail Bank Reduction of administrative costs
- Design and implementation of solutions to optimize business hours within the branches, based on “Lean Breakthrough” methods
- Structuring of a “Network Labelling” approach for new Savings and Loan processes and deployment across 100 branches
- Process simplification, taking into account “Added Value” and balancing “compliance versus performance”
Mechanical Engineering Site Assistance in increasing the production volume of a site, 250 staff members (30% increase in volume, 50% increase in number of products)
- Analysis of the performance of the production unit
- Implementation of the methods, flow mapping and definition of the target production model
- Detailed outline of the structure
- Outline of material flows, in line with Lean principles
- Implementation of manufacturing standards
- Redefinition of the planning system and facilitating plans
- Deployment of 5S sites and SMED
- Steering overall performance
Results: 20% increase in production and 40% increase of the service rate
Electrical Material Manufacturer Optimization of the performance of financial services according to the Lean-Office approach
- Structuring of work methods based on “Lean Breakthrough” methods
- Identification of non value-adding activities
- Solution research and optimization
- Validation and immediate implementation of action plan
- Implementation of performance steering indicators
Results:
15% increase in productivity
Harmonization and consolidation of practices
|
|